Posted by
Sap Land
Friday, 14 October 2011
09:10
This is not possible to have a material as batch managed in one plant and non batch managed in other plants. How will you do stock transfers between the plants? What about batch traceability? If you activate it at plant level, then the batch number is specific to each plant. If activated at material level the same batch number must be maintained in all plants for that material. If it is activated at client level, the batch number say 12345 will be used only once in he client irrespective of the material number. It is possible to move from plant to material to client settings but not backwards without problems.
| | | ---------------Original Message--------------- From: C_Consultor Sent: Thursday, June 14, 2007 2:45 PM Subject: MM Material Master with Batch Management for 1 Plant only Dear all , Use have the same material master in two different Plants. Plant A and B. We are trying to remove the Batch control to material in only one Plant (B). But after do that , Plant A and B remain without this flag activated. I think that system is having a wrongly behavior. Does anyone have passed for this situation ? Does SAP is right ? Best regards, Ale | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Popular White Papers In the Spotlight _.____.__ |
0 Response to "RE:[sap-log-mm] MM Material Master with Batch Management for 1 Plant only"
Post a Comment