[sap-log-mm] PS MM Integration

Posted by irfanshamshi
on Sep 21 at 2:17 AM
Hi Gurus.
I am facing a problem. I am creating material through cj20n as stock items
then I am doing mrp run through md02 and a pr is created.
Then I use md04 and see the pr number.
Now by using this pr if i create po through me21n or md04 also account assignment is not coming secondly for which network I need this material is also not coming.
In md04 its showing that its created for xyz network but the number is not coming when I am using this number to create po.
__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
View this online
  
Popular White Papers

In the Spotlight
View the "Managing the Application Life Cycle" webinar and learn how organizations optimize their SAP applications.

_.____.__

0 Response to "[sap-log-mm] PS MM Integration"

Post a Comment