[sap-log-mm] Linking of system PR with manual PR

Posted by uttamkumarsahu
on Aug 5 at 5:14 AM
Dear all ,

Can anyone tell that is it possible to link the MRP(system) PR while user creating PR for his own requirement.......for eg : system generate a PR (while MRP run) 1500012345 for XYZ material of qty 15.When user wants to create PR and he entered the material code in the system then, is it possible that the PR which is generated through system will appear and if he wants to make some changes then he will do in that time.

My need is to restrict the user to create extra PR when there is a PR which is generated by the system, if he wants some changes he will do in it.

Is it possible ?

Thanks in advance.


Uttam
__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
View this online
  
Popular White Papers

In the Spotlight
Have an SAP Question? Ask Your Peers at Toolbox for IT
_.____.__

0 Response to "[sap-log-mm] Linking of system PR with manual PR"

Post a Comment