RE:[sap-log-mm] Linking of system PR with manual PR

Posted by ha_tran (Senior SAP Supply Chain Business Analyst)
on Aug 6 at 9:32 PM
Hi,

When you create your own PR via ME51N transaction, you can turn on the so-called "Document Overview" where you can list out all related PRs (including MRP-run PRs) that you can use to create your new PR. Is it something you are looking for?

Cheers,
HT

---------------Original Message---------------
From: uttam sahu
Sent: Friday, August 05, 2011 5:15 AM
Subject: Linking of system PR with manual PR

Dear all ,

Can anyone tell that is it possible to link the MRP(system) PR while user creating PR for his own requirement.......for eg : system generate a PR (while MRP run) 1500012345 for XYZ material of qty 15.When user wants to create PR and he entered the material code in the system then, is it possible that the PR which is generated through system will appear and if he wants to make some changes then he will do in that time.

My need is to restrict the user to create extra PR when there is a PR which is generated by the system, if he wants some changes he will do in it.

Is it possible ?

Thanks in advance.


Uttam

__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Mark as helpful
View this online
  
ha_tran
SAP Logistics Material Management Top Contributor

Contributed the most posts in a group for 3 consecutive months to earn a Gold Achievement
Popular White Papers

In the Spotlight
View the "Managing the Application Life Cycle" webinar and learn how organizations optimize their SAP applications.
_.____.__

0 Response to "RE:[sap-log-mm] Linking of system PR with manual PR"

Post a Comment