User can use the report ME5A and check for any open PR for the same material. If found they can then make the relevant changes. Warm Regards Rahul Khandelwal
| | | ---------------Original Message--------------- From: uttam sahu Sent: Friday, August 05, 2011 5:15 AM Subject: Linking of system PR with manual PR Dear all , Can anyone tell that is it possible to link the MRP(system) PR while user creating PR for his own requirement.......for eg : system generate a PR (while MRP run) 1500012345 for XYZ material of qty 15.When user wants to create PR and he entered the material code in the system then, is it possible that the PR which is generated through system will appear and if he wants to make some changes then he will do in that time. My need is to restrict the user to create extra PR when there is a PR which is generated by the system, if he wants some changes he will do in it. Is it possible ? Thanks in advance. Uttam | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Popular White Papers In the Spotlight View the "Managing the Application Life Cycle" webinar and learn how organizations optimize their SAP applications. _.____.__ |
0 Response to "Re: [sap-log-mm] Linking of system PR with manual PR"
Post a Comment