Hi,
I need to schedule a change in master data using mm12 with reference to a change number (so one single change number with one single validity date triggers modification in all objects affected by the change number). So basically, the steps are:
1)Change number creation -->cc01
2)Master data modification with reference to change number -->mm12

I would know if there are any tips in perform this process.

Thanks

---------------Original Message---------------
From: enricodesi
Sent: Monday, June 06, 2011 6:12 AM
Subject: Changing Material Master with ECR

Hi guys,

I need to investigate how to schedule a change in Material Master (Special Procurement type) by using an ECR.
Basically, how should I create Change Master Record in CC01? Are there special fields that have to be used for changing materials?
Thank you in advance

__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Mark as helpful
View this online
  
_.____.__

0 Response to "RE:[sap-log-mm] Changing Material Master with ECR"

Post a Comment