Hi, I need to schedule a change in master data using mm12 with reference to a change number (so one single change number with one single validity date triggers modification in all objects affected by the change number). So basically, the steps are: 1)Change number creation -->cc01 2)Master data modification with reference to change number -->mm12 I would know if there are any tips in perform this process. Thanks
| | | ---------------Original Message--------------- From: enricodesi Sent: Monday, June 06, 2011 6:12 AM Subject: Changing Material Master with ECR Hi guys, I need to investigate how to schedule a change in Material Master (Special Procurement type) by using an ECR. Basically, how should I create Change Master Record in CC01? Are there special fields that have to be used for changing materials? Thank you in advance | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | _.____.__ |
0 Response to "RE:[sap-log-mm] Changing Material Master with ECR"
Post a Comment