Maxim, In V2, the system does not consider requirements other than consumption data. So if to consider external requirements like PD, it should be V1 instead of V2. Regards, Mathew
| | | ---------------Original Message--------------- From: Maxim Sent: Monday, November 14, 2011 10:17 PM Subject: Dependent Requirements from the BOM Currently running components on MRP type V2, but not able to see the DepReqs. on the components. DepReqs can bee seen if MRP type is set to PD. Thanks. Maxim | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Mathew George SAP Logistics Material Management Helper